Press release
PORCHE BUILDING, COMING SPRING 2022! (30/03/2021)
1 document Published on
About the project
The renovation project of the building is being conducted by the SPL Lyon Confluence on behalf of the Metropole of Lyon and the City of Lyon for a budget of €3.3 million.
Program
- Compliance with building standards
- Increasing the capacity of the concert hall (400 seats, up from 300 before renovation) and the creation of a second stage
- Creating social spaces open to users in the neighborhood (cultural café, meeting room, exhibition space, etc.)
- Redeveloping the workspaces (offices, meeting rooms, relaxation areas, etc.)
- Redeveloping the artists' reception areas (dressing rooms, catering, production office, etc.)
- Renovating for global energy saving (low-consumption building target)
- Integrating renewable energy sources (connection to the urban heating grid powered by two-thirds renewable energy, and electricity generation through rooftop photovoltaic panels)
Detail and images on www.lyon-confluence.fr