LET'S OPEN PERRACHE

"Let's open Perrache", phase 2

As of 17 February 2025, the pedestrian footbridge between the Lyon-Perrache Transit Hub (CELP) and the SNCF train station will be definitively closed, ahead of its demolition. Objective: to create a continuous walkway between Place Carnot and the Lyon Perrache SNCF train station, through a fully renovated transit hub. It’s the first step in transforming the CELP!

Reconnecting Lyon’s Presqu’île DISTRICT

The Lyon Perrache transit hub (CELP) is an iconic place that’s essential to Lyon’s functioning. Dating back to 1976, it connects and concentrates all mobility networks in the heart of the Presqu’île: metro, tram, local buses, international coach services, railway. However, this imposing building is currently a hotbed of complex issues related to its functioning: low energy efficiency, old and deteriorating facilities, unoccupied commercial space and significant operating costs for the Métropole de Lyon, its owner. Above all, it represents a major urban blockage between the historic heart of the city and the Confluence district. This is why, phase 2 of the “Let’s Open Perrache” project, led by the Métropole de Lyon, City of Lyon, SPL Lyon Confluence and their partners has three objectives:

  1. reconnect the north and south of the Presqu'île,
  2. renovate and adapt the building and surrounding area to the challenges of climate change,
  3. offer new services in response to 21st-century lifestyles.

It represents the next step in the first phase of the transformation, which began in 2018 and included:

  • creating a new entrance to the train station, located on Place des Archives,
  • fully renovating the old west tunnel, which became Passage France Péjot,
  • extending the T2 tramline to Hôtel de Région - Montrochet.

Seeking to improve traveller comfort

An esplanade for pedestrians

The CELP’s transformation begins in February 2025, with the demolition of the footbridge between the multimodal transport hub and the SNCF train station. Architects Dietmar Feichtinger, Exndo and landscapers from the Base agency have imagined a 12-metre high urban window, open to the first two levels of the transit hub. A large archway will be placed over a gently sloped pedestrian esplanade. connecting Place Carnot and the SNCF train station (on the north side). This will facilitate pedestrian access to trains. In parallel, public spaces between the CELP and the station will be redeveloped for the comfort of local people and train users.

Increased access to public transport

The platforms of the Perrache tram stop have been extended to accommodate new, longer trams (43 metres) by the end of 2025. With 30% more capacity, access to the station via public transport will be significantly improved. Alongside this, Sytral Mobilités is preparing for the arrival of the West Lyon Express Tram (TEOL) by 2032, as well as automating and increasing capacity on metro line A by 2035. Lastly, a new range of secure bike parking with approximately 300 spots will be created in the transit hub.

More than 500 parking spots retained

As for cars, 380 parking spots will be retained and brought up to standard on the Saône side of the building, plus 150 on the Rhône side. Street parking spaces will be retained in front of the entrance to the SNCF train station. The CELP renovation will also include the underpasses beneath the building. They will be fully renovated by the Métropole from 2025 on (network, asphalt, lighting, ventilation, etc.).

The bus station evolves

To respond to current needs and continue its development, the international bus station needs to be moved to a more suitable place. At the end of 2025, regional bus lines and private bus companies (Flixbus, BlaBlaCar Bus, etc.) will move to Gerland, to a section of a huge car park shared by Palais des Sports and Matmut Stadium, developed for this very purpose (platforms, building for travellers, etc.). Within the CELP, only TCL buses and regional train (TER) replacement buses (in the event of interruptions to train services) will remain connected to the train station.

And after the footbridge is demolished?

The CELP’s transformation will involve multiple stages:

  • between February and September 2025: demolition of the footbridge
  • December 2025: redevelopment of the bus station begins
  • 2026-2028: renovation and upgrading of CELP parking
  • 2026-2029: transformation of the transit hub
  • 2028-2030: redevelopment of public spaces by SPL Lyon Confluence

See on lyon-confluence.fr